Monitoraggio in tempo reale dell'infrastruttura e dei servizi di Blue.
Storico di 90 Giorni
Operativo
≥ 99% di disponibilità
Prestazioni Degradate
≥ 95% di disponibilità
Interruzione Maggiore
< 95% di disponibilità
Website
2025-05-12
Operativo (100.0%)
Operativo (100.0%)
2025-05-13
Operativo (100.0%)
Operativo (100.0%)
2025-05-14
Operativo (100.0%)
Operativo (100.0%)
2025-05-15
Operativo (100.0%)
Operativo (100.0%)
2025-05-16
Operativo (100.0%)
Operativo (100.0%)
2025-05-17
Operativo (100.0%)
Operativo (100.0%)
2025-05-18
Operativo (100.0%)
Operativo (100.0%)
2025-05-19
Operativo (100.0%)
Operativo (100.0%)
2025-05-20
Operativo (100.0%)
Operativo (100.0%)
2025-05-21
Operativo (100.0%)
Operativo (100.0%)
2025-05-22
Operativo (100.0%)
Operativo (100.0%)
2025-05-23
Operativo (100.0%)
Operativo (100.0%)
2025-05-24
Operativo (100.0%)
Operativo (100.0%)
2025-05-25
Operativo (100.0%)
Operativo (100.0%)
2025-05-26
Operativo (100.0%)
Operativo (100.0%)
2025-05-27
Operativo (100.0%)
Operativo (100.0%)
2025-05-28
Operativo (100.0%)
Operativo (100.0%)
2025-05-29
Operativo (100.0%)
Operativo (100.0%)
2025-05-30
Operativo (100.0%)
Operativo (100.0%)
2025-05-31
Operativo (100.0%)
Operativo (100.0%)
2025-06-01
Operativo (100.0%)
Operativo (100.0%)
2025-06-02
Operativo (100.0%)
Operativo (100.0%)
2025-06-03
Operativo (100.0%)
Operativo (100.0%)
2025-06-04
Operativo (100.0%)
Operativo (100.0%)
2025-06-05
Operativo (100.0%)
Operativo (100.0%)
2025-06-06
Operativo (100.0%)
Operativo (100.0%)
2025-06-07
Operativo (100.0%)
Operativo (100.0%)
2025-06-08
Operativo (100.0%)
Operativo (100.0%)
2025-06-09
Operativo (100.0%)
Operativo (100.0%)
2025-06-10
Operativo (100.0%)
Operativo (100.0%)
2025-06-11
Operativo (100.0%)
Operativo (100.0%)
2025-06-12
Operativo (100.0%)
Operativo (100.0%)
2025-06-13
Operativo (100.0%)
Operativo (100.0%)
2025-06-14
Operativo (100.0%)
Operativo (100.0%)
2025-06-15
Operativo (100.0%)
Operativo (100.0%)
2025-06-16
Operativo (100.0%)
Operativo (100.0%)
2025-06-17
Operativo (100.0%)
Operativo (100.0%)
2025-06-18
Operativo (100.0%)
Operativo (100.0%)
2025-06-19
Operativo (100.0%)
Operativo (100.0%)
2025-06-20
Operativo (100.0%)
Operativo (100.0%)
2025-06-21
Operativo (100.0%)
Operativo (100.0%)
2025-06-22
Operativo (100.0%)
Operativo (100.0%)
2025-06-23
Operativo (100.0%)
Operativo (100.0%)
2025-06-24
Operativo (100.0%)
Operativo (100.0%)
2025-06-25
Operativo (100.0%)
Operativo (100.0%)
2025-06-26
Operativo (100.0%)
Operativo (100.0%)
2025-06-27
Operativo (100.0%)
Operativo (100.0%)
2025-06-28
Operativo (100.0%)
Operativo (100.0%)
2025-06-29
Operativo (100.0%)
Operativo (100.0%)
2025-06-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-01
Operativo (99.4%)
Operativo (99.4%)
2025-07-02
Operativo (100.0%)
Operativo (100.0%)
2025-07-03
Operativo (100.0%)
Operativo (100.0%)
2025-07-04
Operativo (100.0%)
Operativo (100.0%)
2025-07-05
Operativo (100.0%)
Operativo (100.0%)
2025-07-06
Operativo (100.0%)
Operativo (100.0%)
2025-07-07
Operativo (100.0%)
Operativo (100.0%)
2025-07-08
Operativo (99.4%)
Operativo (99.4%)
2025-07-09
Operativo (100.0%)
Operativo (100.0%)
2025-07-10
Operativo (99.0%)
Operativo (99.0%)
2025-07-11
Operativo (100.0%)
Operativo (100.0%)
2025-07-12
Operativo (100.0%)
Operativo (100.0%)
2025-07-13
Operativo (100.0%)
Operativo (100.0%)
2025-07-14
Operativo (100.0%)
Operativo (100.0%)
2025-07-15
Operativo (100.0%)
Operativo (100.0%)
2025-07-16
Operativo (100.0%)
Operativo (100.0%)
2025-07-17
Operativo (100.0%)
Operativo (100.0%)
2025-07-18
Operativo (100.0%)
Operativo (100.0%)
2025-07-19
Operativo (100.0%)
Operativo (100.0%)
2025-07-20
Operativo (99.7%)
Operativo (99.7%)
2025-07-21
Operativo (99.7%)
Operativo (99.7%)
2025-07-22
Operativo (100.0%)
Operativo (100.0%)
2025-07-23
Operativo (99.7%)
Operativo (99.7%)
2025-07-24
Operativo (100.0%)
Operativo (100.0%)
2025-07-25
Operativo (100.0%)
Operativo (100.0%)
2025-07-26
Operativo (100.0%)
Operativo (100.0%)
2025-07-27
Operativo (99.7%)
Operativo (99.7%)
2025-07-28
Operativo (100.0%)
Operativo (100.0%)
2025-07-29
Operativo (100.0%)
Operativo (100.0%)
2025-07-30
Operativo (99.4%)
Operativo (99.4%)
2025-07-31
Operativo (100.0%)
Operativo (100.0%)
2025-08-01
Operativo (100.0%)
Operativo (100.0%)
2025-08-02
Operativo (100.0%)
Operativo (100.0%)
2025-08-03
Operativo (100.0%)
Operativo (100.0%)
2025-08-04
Operativo (100.0%)
Operativo (100.0%)
2025-08-05
Operativo (100.0%)
Operativo (100.0%)
2025-08-06
Operativo (99.8%)
Operativo (99.8%)
2025-08-07
Operativo (100.0%)
Operativo (100.0%)
2025-08-08
Operativo (100.0%)
Operativo (100.0%)
2025-08-09
Operativo (100.0%)
Operativo (100.0%)
API
2025-05-12
Operativo (100.0%)
Operativo (100.0%)
2025-05-13
Operativo (100.0%)
Operativo (100.0%)
2025-05-14
Operativo (100.0%)
Operativo (100.0%)
2025-05-15
Operativo (100.0%)
Operativo (100.0%)
2025-05-16
Operativo (100.0%)
Operativo (100.0%)
2025-05-17
Operativo (100.0%)
Operativo (100.0%)
2025-05-18
Operativo (100.0%)
Operativo (100.0%)
2025-05-19
Operativo (100.0%)
Operativo (100.0%)
2025-05-20
Operativo (100.0%)
Operativo (100.0%)
2025-05-21
Operativo (100.0%)
Operativo (100.0%)
2025-05-22
Operativo (100.0%)
Operativo (100.0%)
2025-05-23
Operativo (100.0%)
Operativo (100.0%)
2025-05-24
Operativo (100.0%)
Operativo (100.0%)
2025-05-25
Operativo (100.0%)
Operativo (100.0%)
2025-05-26
Operativo (100.0%)
Operativo (100.0%)
2025-05-27
Operativo (100.0%)
Operativo (100.0%)
2025-05-28
Operativo (100.0%)
Operativo (100.0%)
2025-05-29
Operativo (100.0%)
Operativo (100.0%)
2025-05-30
Operativo (100.0%)
Operativo (100.0%)
2025-05-31
Operativo (100.0%)
Operativo (100.0%)
2025-06-01
Operativo (100.0%)
Operativo (100.0%)
2025-06-02
Operativo (100.0%)
Operativo (100.0%)
2025-06-03
Operativo (100.0%)
Operativo (100.0%)
2025-06-04
Operativo (100.0%)
Operativo (100.0%)
2025-06-05
Operativo (100.0%)
Operativo (100.0%)
2025-06-06
Operativo (100.0%)
Operativo (100.0%)
2025-06-07
Operativo (100.0%)
Operativo (100.0%)
2025-06-08
Operativo (100.0%)
Operativo (100.0%)
2025-06-09
Operativo (100.0%)
Operativo (100.0%)
2025-06-10
Operativo (100.0%)
Operativo (100.0%)
2025-06-11
Operativo (100.0%)
Operativo (100.0%)
2025-06-12
Operativo (100.0%)
Operativo (100.0%)
2025-06-13
Operativo (100.0%)
Operativo (100.0%)
2025-06-14
Operativo (100.0%)
Operativo (100.0%)
2025-06-15
Operativo (100.0%)
Operativo (100.0%)
2025-06-16
Operativo (100.0%)
Operativo (100.0%)
2025-06-17
Operativo (100.0%)
Operativo (100.0%)
2025-06-18
Operativo (100.0%)
Operativo (100.0%)
2025-06-19
Operativo (100.0%)
Operativo (100.0%)
2025-06-20
Operativo (100.0%)
Operativo (100.0%)
2025-06-21
Operativo (100.0%)
Operativo (100.0%)
2025-06-22
Operativo (100.0%)
Operativo (100.0%)
2025-06-23
Operativo (100.0%)
Operativo (100.0%)
2025-06-24
Operativo (100.0%)
Operativo (100.0%)
2025-06-25
Operativo (100.0%)
Operativo (100.0%)
2025-06-26
Operativo (100.0%)
Operativo (100.0%)
2025-06-27
Operativo (100.0%)
Operativo (100.0%)
2025-06-28
Operativo (100.0%)
Operativo (100.0%)
2025-06-29
Operativo (100.0%)
Operativo (100.0%)
2025-06-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-01
Operativo (99.4%)
Operativo (99.4%)
2025-07-02
Operativo (100.0%)
Operativo (100.0%)
2025-07-03
Operativo (100.0%)
Operativo (100.0%)
2025-07-04
Operativo (99.5%)
Operativo (99.5%)
2025-07-05
Operativo (100.0%)
Operativo (100.0%)
2025-07-06
Operativo (100.0%)
Operativo (100.0%)
2025-07-07
Operativo (100.0%)
Operativo (100.0%)
2025-07-08
Operativo (100.0%)
Operativo (100.0%)
2025-07-09
Operativo (100.0%)
Operativo (100.0%)
2025-07-10
Operativo (99.5%)
Operativo (99.5%)
2025-07-11
Operativo (100.0%)
Operativo (100.0%)
2025-07-12
Operativo (100.0%)
Operativo (100.0%)
2025-07-13
Operativo (99.8%)
Operativo (99.8%)
2025-07-14
Operativo (100.0%)
Operativo (100.0%)
2025-07-15
Operativo (100.0%)
Operativo (100.0%)
2025-07-16
Operativo (100.0%)
Operativo (100.0%)
2025-07-17
Operativo (99.4%)
Operativo (99.4%)
2025-07-18
Operativo (100.0%)
Operativo (100.0%)
2025-07-19
Operativo (100.0%)
Operativo (100.0%)
2025-07-20
Operativo (99.7%)
Operativo (99.7%)
2025-07-21
Prestazioni Degradate (99.0%)
Prestazioni Degradate (99.0%)
2025-07-22
Operativo (100.0%)
Operativo (100.0%)
2025-07-23
Operativo (99.2%)
Operativo (99.2%)
2025-07-24
Operativo (99.2%)
Operativo (99.2%)
2025-07-25
Operativo (99.4%)
Operativo (99.4%)
2025-07-26
Operativo (99.7%)
Operativo (99.7%)
2025-07-27
Operativo (100.0%)
Operativo (100.0%)
2025-07-28
Operativo (99.5%)
Operativo (99.5%)
2025-07-29
Operativo (99.5%)
Operativo (99.5%)
2025-07-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-31
Operativo (100.0%)
Operativo (100.0%)
2025-08-01
Operativo (99.7%)
Operativo (99.7%)
2025-08-02
Operativo (99.7%)
Operativo (99.7%)
2025-08-03
Operativo (100.0%)
Operativo (100.0%)
2025-08-04
Operativo (99.7%)
Operativo (99.7%)
2025-08-05
Operativo (100.0%)
Operativo (100.0%)
2025-08-06
Operativo (99.8%)
Operativo (99.8%)
2025-08-07
Operativo (100.0%)
Operativo (100.0%)
2025-08-08
Operativo (100.0%)
Operativo (100.0%)
2025-08-09
Operativo (100.0%)
Operativo (100.0%)
Web App
2025-05-12
Operativo (100.0%)
Operativo (100.0%)
2025-05-13
Operativo (100.0%)
Operativo (100.0%)
2025-05-14
Operativo (100.0%)
Operativo (100.0%)
2025-05-15
Operativo (100.0%)
Operativo (100.0%)
2025-05-16
Operativo (100.0%)
Operativo (100.0%)
2025-05-17
Operativo (100.0%)
Operativo (100.0%)
2025-05-18
Operativo (100.0%)
Operativo (100.0%)
2025-05-19
Operativo (100.0%)
Operativo (100.0%)
2025-05-20
Operativo (100.0%)
Operativo (100.0%)
2025-05-21
Operativo (100.0%)
Operativo (100.0%)
2025-05-22
Operativo (100.0%)
Operativo (100.0%)
2025-05-23
Operativo (100.0%)
Operativo (100.0%)
2025-05-24
Operativo (100.0%)
Operativo (100.0%)
2025-05-25
Operativo (100.0%)
Operativo (100.0%)
2025-05-26
Operativo (100.0%)
Operativo (100.0%)
2025-05-27
Operativo (100.0%)
Operativo (100.0%)
2025-05-28
Operativo (100.0%)
Operativo (100.0%)
2025-05-29
Operativo (100.0%)
Operativo (100.0%)
2025-05-30
Operativo (100.0%)
Operativo (100.0%)
2025-05-31
Operativo (100.0%)
Operativo (100.0%)
2025-06-01
Operativo (100.0%)
Operativo (100.0%)
2025-06-02
Operativo (100.0%)
Operativo (100.0%)
2025-06-03
Operativo (100.0%)
Operativo (100.0%)
2025-06-04
Operativo (100.0%)
Operativo (100.0%)
2025-06-05
Operativo (100.0%)
Operativo (100.0%)
2025-06-06
Operativo (100.0%)
Operativo (100.0%)
2025-06-07
Operativo (100.0%)
Operativo (100.0%)
2025-06-08
Operativo (100.0%)
Operativo (100.0%)
2025-06-09
Operativo (100.0%)
Operativo (100.0%)
2025-06-10
Operativo (100.0%)
Operativo (100.0%)
2025-06-11
Operativo (100.0%)
Operativo (100.0%)
2025-06-12
Operativo (100.0%)
Operativo (100.0%)
2025-06-13
Operativo (100.0%)
Operativo (100.0%)
2025-06-14
Operativo (100.0%)
Operativo (100.0%)
2025-06-15
Operativo (100.0%)
Operativo (100.0%)
2025-06-16
Operativo (100.0%)
Operativo (100.0%)
2025-06-17
Operativo (100.0%)
Operativo (100.0%)
2025-06-18
Operativo (100.0%)
Operativo (100.0%)
2025-06-19
Operativo (100.0%)
Operativo (100.0%)
2025-06-20
Operativo (100.0%)
Operativo (100.0%)
2025-06-21
Operativo (100.0%)
Operativo (100.0%)
2025-06-22
Operativo (100.0%)
Operativo (100.0%)
2025-06-23
Operativo (100.0%)
Operativo (100.0%)
2025-06-24
Operativo (100.0%)
Operativo (100.0%)
2025-06-25
Operativo (100.0%)
Operativo (100.0%)
2025-06-26
Operativo (100.0%)
Operativo (100.0%)
2025-06-27
Operativo (100.0%)
Operativo (100.0%)
2025-06-28
Operativo (100.0%)
Operativo (100.0%)
2025-06-29
Operativo (100.0%)
Operativo (100.0%)
2025-06-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-01
Operativo (99.4%)
Operativo (99.4%)
2025-07-02
Operativo (100.0%)
Operativo (100.0%)
2025-07-03
Operativo (100.0%)
Operativo (100.0%)
2025-07-04
Operativo (99.5%)
Operativo (99.5%)
2025-07-05
Operativo (100.0%)
Operativo (100.0%)
2025-07-06
Operativo (100.0%)
Operativo (100.0%)
2025-07-07
Operativo (100.0%)
Operativo (100.0%)
2025-07-08
Operativo (100.0%)
Operativo (100.0%)
2025-07-09
Operativo (100.0%)
Operativo (100.0%)
2025-07-10
Operativo (99.5%)
Operativo (99.5%)
2025-07-11
Operativo (100.0%)
Operativo (100.0%)
2025-07-12
Operativo (100.0%)
Operativo (100.0%)
2025-07-13
Operativo (100.0%)
Operativo (100.0%)
2025-07-14
Operativo (100.0%)
Operativo (100.0%)
2025-07-15
Operativo (100.0%)
Operativo (100.0%)
2025-07-16
Operativo (100.0%)
Operativo (100.0%)
2025-07-17
Operativo (100.0%)
Operativo (100.0%)
2025-07-18
Operativo (100.0%)
Operativo (100.0%)
2025-07-19
Operativo (100.0%)
Operativo (100.0%)
2025-07-20
Operativo (99.7%)
Operativo (99.7%)
2025-07-21
Operativo (99.7%)
Operativo (99.7%)
2025-07-22
Operativo (99.7%)
Operativo (99.7%)
2025-07-23
Operativo (99.7%)
Operativo (99.7%)
2025-07-24
Operativo (99.7%)
Operativo (99.7%)
2025-07-25
Operativo (99.7%)
Operativo (99.7%)
2025-07-26
Operativo (100.0%)
Operativo (100.0%)
2025-07-27
Operativo (99.7%)
Operativo (99.7%)
2025-07-28
Operativo (100.0%)
Operativo (100.0%)
2025-07-29
Operativo (100.0%)
Operativo (100.0%)
2025-07-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-31
Operativo (100.0%)
Operativo (100.0%)
2025-08-01
Operativo (100.0%)
Operativo (100.0%)
2025-08-02
Operativo (100.0%)
Operativo (100.0%)
2025-08-03
Operativo (100.0%)
Operativo (100.0%)
2025-08-04
Operativo (100.0%)
Operativo (100.0%)
2025-08-05
Operativo (99.4%)
Operativo (99.4%)
2025-08-06
Operativo (99.8%)
Operativo (99.8%)
2025-08-07
Operativo (100.0%)
Operativo (100.0%)
2025-08-08
Operativo (100.0%)
Operativo (100.0%)
2025-08-09
Operativo (100.0%)
Operativo (100.0%)
Beta Web App
2025-05-12
Operativo (100.0%)
Operativo (100.0%)
2025-05-13
Operativo (100.0%)
Operativo (100.0%)
2025-05-14
Operativo (100.0%)
Operativo (100.0%)
2025-05-15
Operativo (100.0%)
Operativo (100.0%)
2025-05-16
Operativo (100.0%)
Operativo (100.0%)
2025-05-17
Operativo (100.0%)
Operativo (100.0%)
2025-05-18
Operativo (100.0%)
Operativo (100.0%)
2025-05-19
Operativo (100.0%)
Operativo (100.0%)
2025-05-20
Operativo (100.0%)
Operativo (100.0%)
2025-05-21
Operativo (100.0%)
Operativo (100.0%)
2025-05-22
Operativo (100.0%)
Operativo (100.0%)
2025-05-23
Operativo (100.0%)
Operativo (100.0%)
2025-05-24
Operativo (100.0%)
Operativo (100.0%)
2025-05-25
Operativo (100.0%)
Operativo (100.0%)
2025-05-26
Operativo (100.0%)
Operativo (100.0%)
2025-05-27
Operativo (100.0%)
Operativo (100.0%)
2025-05-28
Operativo (100.0%)
Operativo (100.0%)
2025-05-29
Operativo (100.0%)
Operativo (100.0%)
2025-05-30
Operativo (100.0%)
Operativo (100.0%)
2025-05-31
Operativo (100.0%)
Operativo (100.0%)
2025-06-01
Operativo (100.0%)
Operativo (100.0%)
2025-06-02
Operativo (100.0%)
Operativo (100.0%)
2025-06-03
Operativo (100.0%)
Operativo (100.0%)
2025-06-04
Operativo (100.0%)
Operativo (100.0%)
2025-06-05
Operativo (100.0%)
Operativo (100.0%)
2025-06-06
Operativo (100.0%)
Operativo (100.0%)
2025-06-07
Operativo (100.0%)
Operativo (100.0%)
2025-06-08
Operativo (100.0%)
Operativo (100.0%)
2025-06-09
Operativo (100.0%)
Operativo (100.0%)
2025-06-10
Operativo (100.0%)
Operativo (100.0%)
2025-06-11
Operativo (100.0%)
Operativo (100.0%)
2025-06-12
Operativo (100.0%)
Operativo (100.0%)
2025-06-13
Operativo (100.0%)
Operativo (100.0%)
2025-06-14
Operativo (100.0%)
Operativo (100.0%)
2025-06-15
Operativo (100.0%)
Operativo (100.0%)
2025-06-16
Operativo (100.0%)
Operativo (100.0%)
2025-06-17
Operativo (100.0%)
Operativo (100.0%)
2025-06-18
Operativo (100.0%)
Operativo (100.0%)
2025-06-19
Operativo (100.0%)
Operativo (100.0%)
2025-06-20
Operativo (100.0%)
Operativo (100.0%)
2025-06-21
Operativo (100.0%)
Operativo (100.0%)
2025-06-22
Operativo (100.0%)
Operativo (100.0%)
2025-06-23
Operativo (100.0%)
Operativo (100.0%)
2025-06-24
Operativo (100.0%)
Operativo (100.0%)
2025-06-25
Operativo (100.0%)
Operativo (100.0%)
2025-06-26
Operativo (100.0%)
Operativo (100.0%)
2025-06-27
Operativo (100.0%)
Operativo (100.0%)
2025-06-28
Operativo (100.0%)
Operativo (100.0%)
2025-06-29
Operativo (100.0%)
Operativo (100.0%)
2025-06-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-01
Operativo (99.4%)
Operativo (99.4%)
2025-07-02
Operativo (99.8%)
Operativo (99.8%)
2025-07-03
Operativo (100.0%)
Operativo (100.0%)
2025-07-04
Operativo (99.5%)
Operativo (99.5%)
2025-07-05
Operativo (100.0%)
Operativo (100.0%)
2025-07-06
Operativo (100.0%)
Operativo (100.0%)
2025-07-07
Operativo (100.0%)
Operativo (100.0%)
2025-07-08
Operativo (100.0%)
Operativo (100.0%)
2025-07-09
Operativo (100.0%)
Operativo (100.0%)
2025-07-10
Operativo (99.5%)
Operativo (99.5%)
2025-07-11
Operativo (100.0%)
Operativo (100.0%)
2025-07-12
Operativo (100.0%)
Operativo (100.0%)
2025-07-13
Operativo (99.8%)
Operativo (99.8%)
2025-07-14
Operativo (100.0%)
Operativo (100.0%)
2025-07-15
Operativo (100.0%)
Operativo (100.0%)
2025-07-16
Operativo (100.0%)
Operativo (100.0%)
2025-07-17
Operativo (100.0%)
Operativo (100.0%)
2025-07-18
Operativo (99.8%)
Operativo (99.8%)
2025-07-19
Operativo (100.0%)
Operativo (100.0%)
2025-07-20
Operativo (99.7%)
Operativo (99.7%)
2025-07-21
Operativo (99.7%)
Operativo (99.7%)
2025-07-22
Operativo (100.0%)
Operativo (100.0%)
2025-07-23
Operativo (99.7%)
Operativo (99.7%)
2025-07-24
Operativo (99.7%)
Operativo (99.7%)
2025-07-25
Operativo (100.0%)
Operativo (100.0%)
2025-07-26
Operativo (99.7%)
Operativo (99.7%)
2025-07-27
Operativo (100.0%)
Operativo (100.0%)
2025-07-28
Operativo (100.0%)
Operativo (100.0%)
2025-07-29
Operativo (99.8%)
Operativo (99.8%)
2025-07-30
Operativo (99.7%)
Operativo (99.7%)
2025-07-31
Operativo (100.0%)
Operativo (100.0%)
2025-08-01
Operativo (99.7%)
Operativo (99.7%)
2025-08-02
Operativo (100.0%)
Operativo (100.0%)
2025-08-03
Operativo (100.0%)
Operativo (100.0%)
2025-08-04
Operativo (100.0%)
Operativo (100.0%)
2025-08-05
Operativo (100.0%)
Operativo (100.0%)
2025-08-06
Operativo (99.8%)
Operativo (99.8%)
2025-08-07
Operativo (100.0%)
Operativo (100.0%)
2025-08-08
Operativo (100.0%)
Operativo (100.0%)
2025-08-09
Operativo (100.0%)
Operativo (100.0%)
Beta API
2025-05-12
Operativo (100.0%)
Operativo (100.0%)
2025-05-13
Operativo (100.0%)
Operativo (100.0%)
2025-05-14
Operativo (100.0%)
Operativo (100.0%)
2025-05-15
Operativo (100.0%)
Operativo (100.0%)
2025-05-16
Operativo (100.0%)
Operativo (100.0%)
2025-05-17
Operativo (100.0%)
Operativo (100.0%)
2025-05-18
Operativo (100.0%)
Operativo (100.0%)
2025-05-19
Operativo (100.0%)
Operativo (100.0%)
2025-05-20
Operativo (100.0%)
Operativo (100.0%)
2025-05-21
Operativo (100.0%)
Operativo (100.0%)
2025-05-22
Operativo (100.0%)
Operativo (100.0%)
2025-05-23
Operativo (100.0%)
Operativo (100.0%)
2025-05-24
Operativo (100.0%)
Operativo (100.0%)
2025-05-25
Operativo (100.0%)
Operativo (100.0%)
2025-05-26
Operativo (100.0%)
Operativo (100.0%)
2025-05-27
Operativo (100.0%)
Operativo (100.0%)
2025-05-28
Operativo (100.0%)
Operativo (100.0%)
2025-05-29
Operativo (100.0%)
Operativo (100.0%)
2025-05-30
Operativo (100.0%)
Operativo (100.0%)
2025-05-31
Operativo (100.0%)
Operativo (100.0%)
2025-06-01
Operativo (100.0%)
Operativo (100.0%)
2025-06-02
Operativo (100.0%)
Operativo (100.0%)
2025-06-03
Operativo (100.0%)
Operativo (100.0%)
2025-06-04
Operativo (100.0%)
Operativo (100.0%)
2025-06-05
Operativo (100.0%)
Operativo (100.0%)
2025-06-06
Operativo (100.0%)
Operativo (100.0%)
2025-06-07
Operativo (100.0%)
Operativo (100.0%)
2025-06-08
Operativo (100.0%)
Operativo (100.0%)
2025-06-09
Operativo (100.0%)
Operativo (100.0%)
2025-06-10
Operativo (100.0%)
Operativo (100.0%)
2025-06-11
Operativo (100.0%)
Operativo (100.0%)
2025-06-12
Operativo (100.0%)
Operativo (100.0%)
2025-06-13
Operativo (100.0%)
Operativo (100.0%)
2025-06-14
Operativo (100.0%)
Operativo (100.0%)
2025-06-15
Operativo (100.0%)
Operativo (100.0%)
2025-06-16
Operativo (100.0%)
Operativo (100.0%)
2025-06-17
Operativo (100.0%)
Operativo (100.0%)
2025-06-18
Operativo (100.0%)
Operativo (100.0%)
2025-06-19
Operativo (100.0%)
Operativo (100.0%)
2025-06-20
Operativo (100.0%)
Operativo (100.0%)
2025-06-21
Operativo (100.0%)
Operativo (100.0%)
2025-06-22
Operativo (100.0%)
Operativo (100.0%)
2025-06-23
Operativo (100.0%)
Operativo (100.0%)
2025-06-24
Operativo (100.0%)
Operativo (100.0%)
2025-06-25
Operativo (100.0%)
Operativo (100.0%)
2025-06-26
Operativo (100.0%)
Operativo (100.0%)
2025-06-27
Operativo (100.0%)
Operativo (100.0%)
2025-06-28
Operativo (100.0%)
Operativo (100.0%)
2025-06-29
Operativo (100.0%)
Operativo (100.0%)
2025-06-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-01
Operativo (99.4%)
Operativo (99.4%)
2025-07-02
Operativo (99.8%)
Operativo (99.8%)
2025-07-03
Operativo (100.0%)
Operativo (100.0%)
2025-07-04
Prestazioni Degradate (99.0%)
Prestazioni Degradate (99.0%)
2025-07-05
Operativo (100.0%)
Operativo (100.0%)
2025-07-06
Operativo (100.0%)
Operativo (100.0%)
2025-07-07
Operativo (100.0%)
Operativo (100.0%)
2025-07-08
Operativo (100.0%)
Operativo (100.0%)
2025-07-09
Operativo (99.5%)
Operativo (99.5%)
2025-07-10
Prestazioni Degradate (98.8%)
Prestazioni Degradate (98.8%)
2025-07-11
Operativo (100.0%)
Operativo (100.0%)
2025-07-12
Operativo (99.8%)
Operativo (99.8%)
2025-07-13
Operativo (99.8%)
Operativo (99.8%)
2025-07-14
Operativo (99.5%)
Operativo (99.5%)
2025-07-15
Operativo (99.7%)
Operativo (99.7%)
2025-07-16
Operativo (100.0%)
Operativo (100.0%)
2025-07-17
Operativo (99.2%)
Operativo (99.2%)
2025-07-18
Operativo (99.3%)
Operativo (99.3%)
2025-07-19
Operativo (100.0%)
Operativo (100.0%)
2025-07-20
Operativo (100.0%)
Operativo (100.0%)
2025-07-21
Prestazioni Degradate (97.9%)
Prestazioni Degradate (97.9%)
2025-07-22
Operativo (99.2%)
Operativo (99.2%)
2025-07-23
Prestazioni Degradate (98.7%)
Prestazioni Degradate (98.7%)
2025-07-24
Operativo (99.2%)
Operativo (99.2%)
2025-07-25
Prestazioni Degradate (98.8%)
Prestazioni Degradate (98.8%)
2025-07-26
Operativo (100.0%)
Operativo (100.0%)
2025-07-27
Operativo (100.0%)
Operativo (100.0%)
2025-07-28
Prestazioni Degradate (98.7%)
Prestazioni Degradate (98.7%)
2025-07-29
Operativo (99.5%)
Operativo (99.5%)
2025-07-30
Operativo (99.1%)
Operativo (99.1%)
2025-07-31
Operativo (99.7%)
Operativo (99.7%)
2025-08-01
Prestazioni Degradate (98.2%)
Prestazioni Degradate (98.2%)
2025-08-02
Operativo (100.0%)
Operativo (100.0%)
2025-08-03
Operativo (100.0%)
Operativo (100.0%)
2025-08-04
Operativo (99.7%)
Operativo (99.7%)
2025-08-05
Operativo (99.1%)
Operativo (99.1%)
2025-08-06
Operativo (99.3%)
Operativo (99.3%)
2025-08-07
Operativo (99.3%)
Operativo (99.3%)
2025-08-08
Operativo (100.0%)
Operativo (100.0%)
2025-08-09
Operativo (100.0%)
Operativo (100.0%)
Background Services
2025-05-12
Operativo (100.0%)
Operativo (100.0%)
2025-05-13
Operativo (100.0%)
Operativo (100.0%)
2025-05-14
Operativo (100.0%)
Operativo (100.0%)
2025-05-15
Operativo (100.0%)
Operativo (100.0%)
2025-05-16
Operativo (100.0%)
Operativo (100.0%)
2025-05-17
Operativo (100.0%)
Operativo (100.0%)
2025-05-18
Operativo (100.0%)
Operativo (100.0%)
2025-05-19
Operativo (100.0%)
Operativo (100.0%)
2025-05-20
Operativo (100.0%)
Operativo (100.0%)
2025-05-21
Operativo (100.0%)
Operativo (100.0%)
2025-05-22
Operativo (100.0%)
Operativo (100.0%)
2025-05-23
Operativo (100.0%)
Operativo (100.0%)
2025-05-24
Operativo (100.0%)
Operativo (100.0%)
2025-05-25
Operativo (100.0%)
Operativo (100.0%)
2025-05-26
Operativo (100.0%)
Operativo (100.0%)
2025-05-27
Operativo (100.0%)
Operativo (100.0%)
2025-05-28
Operativo (100.0%)
Operativo (100.0%)
2025-05-29
Operativo (100.0%)
Operativo (100.0%)
2025-05-30
Operativo (100.0%)
Operativo (100.0%)
2025-05-31
Operativo (100.0%)
Operativo (100.0%)
2025-06-01
Operativo (100.0%)
Operativo (100.0%)
2025-06-02
Operativo (100.0%)
Operativo (100.0%)
2025-06-03
Operativo (100.0%)
Operativo (100.0%)
2025-06-04
Operativo (100.0%)
Operativo (100.0%)
2025-06-05
Operativo (100.0%)
Operativo (100.0%)
2025-06-06
Operativo (100.0%)
Operativo (100.0%)
2025-06-07
Operativo (100.0%)
Operativo (100.0%)
2025-06-08
Operativo (100.0%)
Operativo (100.0%)
2025-06-09
Operativo (100.0%)
Operativo (100.0%)
2025-06-10
Operativo (100.0%)
Operativo (100.0%)
2025-06-11
Operativo (100.0%)
Operativo (100.0%)
2025-06-12
Operativo (100.0%)
Operativo (100.0%)
2025-06-13
Operativo (100.0%)
Operativo (100.0%)
2025-06-14
Operativo (100.0%)
Operativo (100.0%)
2025-06-15
Operativo (100.0%)
Operativo (100.0%)
2025-06-16
Operativo (100.0%)
Operativo (100.0%)
2025-06-17
Operativo (100.0%)
Operativo (100.0%)
2025-06-18
Operativo (100.0%)
Operativo (100.0%)
2025-06-19
Operativo (100.0%)
Operativo (100.0%)
2025-06-20
Operativo (100.0%)
Operativo (100.0%)
2025-06-21
Operativo (100.0%)
Operativo (100.0%)
2025-06-22
Operativo (100.0%)
Operativo (100.0%)
2025-06-23
Operativo (100.0%)
Operativo (100.0%)
2025-06-24
Operativo (100.0%)
Operativo (100.0%)
2025-06-25
Operativo (100.0%)
Operativo (100.0%)
2025-06-26
Operativo (100.0%)
Operativo (100.0%)
2025-06-27
Operativo (100.0%)
Operativo (100.0%)
2025-06-28
Operativo (100.0%)
Operativo (100.0%)
2025-06-29
Operativo (100.0%)
Operativo (100.0%)
2025-06-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-01
Operativo (99.4%)
Operativo (99.4%)
2025-07-02
Operativo (100.0%)
Operativo (100.0%)
2025-07-03
Operativo (100.0%)
Operativo (100.0%)
2025-07-04
Operativo (99.5%)
Operativo (99.5%)
2025-07-05
Operativo (100.0%)
Operativo (100.0%)
2025-07-06
Operativo (100.0%)
Operativo (100.0%)
2025-07-07
Operativo (100.0%)
Operativo (100.0%)
2025-07-08
Operativo (100.0%)
Operativo (100.0%)
2025-07-09
Operativo (100.0%)
Operativo (100.0%)
2025-07-10
Operativo (99.5%)
Operativo (99.5%)
2025-07-11
Operativo (100.0%)
Operativo (100.0%)
2025-07-12
Operativo (100.0%)
Operativo (100.0%)
2025-07-13
Operativo (100.0%)
Operativo (100.0%)
2025-07-14
Operativo (100.0%)
Operativo (100.0%)
2025-07-15
Operativo (100.0%)
Operativo (100.0%)
2025-07-16
Operativo (100.0%)
Operativo (100.0%)
2025-07-17
Operativo (100.0%)
Operativo (100.0%)
2025-07-18
Operativo (100.0%)
Operativo (100.0%)
2025-07-19
Operativo (100.0%)
Operativo (100.0%)
2025-07-20
Operativo (99.7%)
Operativo (99.7%)
2025-07-21
Operativo (99.7%)
Operativo (99.7%)
2025-07-22
Operativo (100.0%)
Operativo (100.0%)
2025-07-23
Operativo (99.7%)
Operativo (99.7%)
2025-07-24
Operativo (99.7%)
Operativo (99.7%)
2025-07-25
Operativo (100.0%)
Operativo (100.0%)
2025-07-26
Operativo (100.0%)
Operativo (100.0%)
2025-07-27
Operativo (100.0%)
Operativo (100.0%)
2025-07-28
Operativo (100.0%)
Operativo (100.0%)
2025-07-29
Operativo (99.8%)
Operativo (99.8%)
2025-07-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-31
Operativo (100.0%)
Operativo (100.0%)
2025-08-01
Operativo (99.7%)
Operativo (99.7%)
2025-08-02
Operativo (100.0%)
Operativo (100.0%)
2025-08-03
Operativo (100.0%)
Operativo (100.0%)
2025-08-04
Operativo (99.7%)
Operativo (99.7%)
2025-08-05
Operativo (99.7%)
Operativo (99.7%)
2025-08-06
Operativo (99.5%)
Operativo (99.5%)
2025-08-07
Operativo (99.6%)
Operativo (99.6%)
2025-08-08
Operativo (100.0%)
Operativo (100.0%)
2025-08-09
Operativo (100.0%)
Operativo (100.0%)
Forms
2025-05-12
Operativo (100.0%)
Operativo (100.0%)
2025-05-13
Operativo (100.0%)
Operativo (100.0%)
2025-05-14
Operativo (100.0%)
Operativo (100.0%)
2025-05-15
Operativo (100.0%)
Operativo (100.0%)
2025-05-16
Operativo (100.0%)
Operativo (100.0%)
2025-05-17
Operativo (100.0%)
Operativo (100.0%)
2025-05-18
Operativo (100.0%)
Operativo (100.0%)
2025-05-19
Operativo (100.0%)
Operativo (100.0%)
2025-05-20
Operativo (100.0%)
Operativo (100.0%)
2025-05-21
Operativo (100.0%)
Operativo (100.0%)
2025-05-22
Operativo (100.0%)
Operativo (100.0%)
2025-05-23
Operativo (100.0%)
Operativo (100.0%)
2025-05-24
Operativo (100.0%)
Operativo (100.0%)
2025-05-25
Operativo (100.0%)
Operativo (100.0%)
2025-05-26
Operativo (100.0%)
Operativo (100.0%)
2025-05-27
Operativo (100.0%)
Operativo (100.0%)
2025-05-28
Operativo (100.0%)
Operativo (100.0%)
2025-05-29
Operativo (100.0%)
Operativo (100.0%)
2025-05-30
Operativo (100.0%)
Operativo (100.0%)
2025-05-31
Operativo (100.0%)
Operativo (100.0%)
2025-06-01
Operativo (100.0%)
Operativo (100.0%)
2025-06-02
Operativo (100.0%)
Operativo (100.0%)
2025-06-03
Operativo (100.0%)
Operativo (100.0%)
2025-06-04
Operativo (100.0%)
Operativo (100.0%)
2025-06-05
Operativo (100.0%)
Operativo (100.0%)
2025-06-06
Operativo (100.0%)
Operativo (100.0%)
2025-06-07
Operativo (100.0%)
Operativo (100.0%)
2025-06-08
Operativo (100.0%)
Operativo (100.0%)
2025-06-09
Operativo (100.0%)
Operativo (100.0%)
2025-06-10
Operativo (100.0%)
Operativo (100.0%)
2025-06-11
Operativo (100.0%)
Operativo (100.0%)
2025-06-12
Operativo (100.0%)
Operativo (100.0%)
2025-06-13
Operativo (100.0%)
Operativo (100.0%)
2025-06-14
Operativo (100.0%)
Operativo (100.0%)
2025-06-15
Operativo (100.0%)
Operativo (100.0%)
2025-06-16
Operativo (100.0%)
Operativo (100.0%)
2025-06-17
Operativo (100.0%)
Operativo (100.0%)
2025-06-18
Operativo (100.0%)
Operativo (100.0%)
2025-06-19
Operativo (100.0%)
Operativo (100.0%)
2025-06-20
Operativo (100.0%)
Operativo (100.0%)
2025-06-21
Operativo (100.0%)
Operativo (100.0%)
2025-06-22
Operativo (100.0%)
Operativo (100.0%)
2025-06-23
Operativo (100.0%)
Operativo (100.0%)
2025-06-24
Operativo (100.0%)
Operativo (100.0%)
2025-06-25
Operativo (100.0%)
Operativo (100.0%)
2025-06-26
Operativo (100.0%)
Operativo (100.0%)
2025-06-27
Operativo (100.0%)
Operativo (100.0%)
2025-06-28
Operativo (100.0%)
Operativo (100.0%)
2025-06-29
Operativo (100.0%)
Operativo (100.0%)
2025-06-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-01
Operativo (99.4%)
Operativo (99.4%)
2025-07-02
Operativo (100.0%)
Operativo (100.0%)
2025-07-03
Operativo (100.0%)
Operativo (100.0%)
2025-07-04
Operativo (100.0%)
Operativo (100.0%)
2025-07-05
Operativo (100.0%)
Operativo (100.0%)
2025-07-06
Operativo (100.0%)
Operativo (100.0%)
2025-07-07
Operativo (100.0%)
Operativo (100.0%)
2025-07-08
Operativo (100.0%)
Operativo (100.0%)
2025-07-09
Operativo (100.0%)
Operativo (100.0%)
2025-07-10
Operativo (99.5%)
Operativo (99.5%)
2025-07-11
Operativo (100.0%)
Operativo (100.0%)
2025-07-12
Operativo (100.0%)
Operativo (100.0%)
2025-07-13
Operativo (100.0%)
Operativo (100.0%)
2025-07-14
Operativo (100.0%)
Operativo (100.0%)
2025-07-15
Operativo (99.7%)
Operativo (99.7%)
2025-07-16
Operativo (99.7%)
Operativo (99.7%)
2025-07-17
Operativo (100.0%)
Operativo (100.0%)
2025-07-18
Operativo (100.0%)
Operativo (100.0%)
2025-07-19
Operativo (100.0%)
Operativo (100.0%)
2025-07-20
Operativo (99.7%)
Operativo (99.7%)
2025-07-21
Operativo (99.5%)
Operativo (99.5%)
2025-07-22
Operativo (100.0%)
Operativo (100.0%)
2025-07-23
Operativo (99.7%)
Operativo (99.7%)
2025-07-24
Operativo (99.7%)
Operativo (99.7%)
2025-07-25
Operativo (100.0%)
Operativo (100.0%)
2025-07-26
Operativo (99.7%)
Operativo (99.7%)
2025-07-27
Operativo (100.0%)
Operativo (100.0%)
2025-07-28
Operativo (100.0%)
Operativo (100.0%)
2025-07-29
Operativo (99.8%)
Operativo (99.8%)
2025-07-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-31
Operativo (100.0%)
Operativo (100.0%)
2025-08-01
Operativo (100.0%)
Operativo (100.0%)
2025-08-02
Operativo (100.0%)
Operativo (100.0%)
2025-08-03
Operativo (100.0%)
Operativo (100.0%)
2025-08-04
Operativo (99.7%)
Operativo (99.7%)
2025-08-05
Operativo (100.0%)
Operativo (100.0%)
2025-08-06
Operativo (99.8%)
Operativo (99.8%)
2025-08-07
Operativo (100.0%)
Operativo (100.0%)
2025-08-08
Operativo (100.0%)
Operativo (100.0%)
2025-08-09
Operativo (100.0%)
Operativo (100.0%)
Files
2025-05-12
Operativo (100.0%)
Operativo (100.0%)
2025-05-13
Operativo (100.0%)
Operativo (100.0%)
2025-05-14
Operativo (100.0%)
Operativo (100.0%)
2025-05-15
Operativo (100.0%)
Operativo (100.0%)
2025-05-16
Operativo (100.0%)
Operativo (100.0%)
2025-05-17
Operativo (100.0%)
Operativo (100.0%)
2025-05-18
Operativo (100.0%)
Operativo (100.0%)
2025-05-19
Operativo (100.0%)
Operativo (100.0%)
2025-05-20
Operativo (100.0%)
Operativo (100.0%)
2025-05-21
Operativo (100.0%)
Operativo (100.0%)
2025-05-22
Operativo (100.0%)
Operativo (100.0%)
2025-05-23
Operativo (100.0%)
Operativo (100.0%)
2025-05-24
Operativo (100.0%)
Operativo (100.0%)
2025-05-25
Operativo (100.0%)
Operativo (100.0%)
2025-05-26
Operativo (100.0%)
Operativo (100.0%)
2025-05-27
Operativo (100.0%)
Operativo (100.0%)
2025-05-28
Operativo (100.0%)
Operativo (100.0%)
2025-05-29
Operativo (100.0%)
Operativo (100.0%)
2025-05-30
Operativo (100.0%)
Operativo (100.0%)
2025-05-31
Operativo (100.0%)
Operativo (100.0%)
2025-06-01
Operativo (100.0%)
Operativo (100.0%)
2025-06-02
Operativo (100.0%)
Operativo (100.0%)
2025-06-03
Operativo (100.0%)
Operativo (100.0%)
2025-06-04
Operativo (100.0%)
Operativo (100.0%)
2025-06-05
Operativo (100.0%)
Operativo (100.0%)
2025-06-06
Operativo (100.0%)
Operativo (100.0%)
2025-06-07
Operativo (100.0%)
Operativo (100.0%)
2025-06-08
Operativo (100.0%)
Operativo (100.0%)
2025-06-09
Operativo (100.0%)
Operativo (100.0%)
2025-06-10
Operativo (100.0%)
Operativo (100.0%)
2025-06-11
Operativo (100.0%)
Operativo (100.0%)
2025-06-12
Operativo (100.0%)
Operativo (100.0%)
2025-06-13
Operativo (100.0%)
Operativo (100.0%)
2025-06-14
Operativo (100.0%)
Operativo (100.0%)
2025-06-15
Operativo (100.0%)
Operativo (100.0%)
2025-06-16
Operativo (100.0%)
Operativo (100.0%)
2025-06-17
Operativo (100.0%)
Operativo (100.0%)
2025-06-18
Operativo (100.0%)
Operativo (100.0%)
2025-06-19
Operativo (100.0%)
Operativo (100.0%)
2025-06-20
Operativo (100.0%)
Operativo (100.0%)
2025-06-21
Operativo (100.0%)
Operativo (100.0%)
2025-06-22
Operativo (100.0%)
Operativo (100.0%)
2025-06-23
Operativo (100.0%)
Operativo (100.0%)
2025-06-24
Operativo (100.0%)
Operativo (100.0%)
2025-06-25
Operativo (100.0%)
Operativo (100.0%)
2025-06-26
Operativo (100.0%)
Operativo (100.0%)
2025-06-27
Operativo (100.0%)
Operativo (100.0%)
2025-06-28
Operativo (100.0%)
Operativo (100.0%)
2025-06-29
Operativo (100.0%)
Operativo (100.0%)
2025-06-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-01
Operativo (99.4%)
Operativo (99.4%)
2025-07-02
Operativo (100.0%)
Operativo (100.0%)
2025-07-03
Operativo (100.0%)
Operativo (100.0%)
2025-07-04
Operativo (99.5%)
Operativo (99.5%)
2025-07-05
Operativo (100.0%)
Operativo (100.0%)
2025-07-06
Operativo (100.0%)
Operativo (100.0%)
2025-07-07
Operativo (100.0%)
Operativo (100.0%)
2025-07-08
Operativo (100.0%)
Operativo (100.0%)
2025-07-09
Operativo (100.0%)
Operativo (100.0%)
2025-07-10
Operativo (99.5%)
Operativo (99.5%)
2025-07-11
Operativo (100.0%)
Operativo (100.0%)
2025-07-12
Operativo (100.0%)
Operativo (100.0%)
2025-07-13
Operativo (100.0%)
Operativo (100.0%)
2025-07-14
Operativo (100.0%)
Operativo (100.0%)
2025-07-15
Operativo (99.7%)
Operativo (99.7%)
2025-07-16
Operativo (100.0%)
Operativo (100.0%)
2025-07-17
Operativo (100.0%)
Operativo (100.0%)
2025-07-18
Operativo (100.0%)
Operativo (100.0%)
2025-07-19
Operativo (99.7%)
Operativo (99.7%)
2025-07-20
Operativo (99.4%)
Operativo (99.4%)
2025-07-21
Operativo (99.7%)
Operativo (99.7%)
2025-07-22
Operativo (100.0%)
Operativo (100.0%)
2025-07-23
Operativo (99.7%)
Operativo (99.7%)
2025-07-24
Operativo (100.0%)
Operativo (100.0%)
2025-07-25
Operativo (100.0%)
Operativo (100.0%)
2025-07-26
Operativo (99.7%)
Operativo (99.7%)
2025-07-27
Operativo (100.0%)
Operativo (100.0%)
2025-07-28
Operativo (100.0%)
Operativo (100.0%)
2025-07-29
Operativo (100.0%)
Operativo (100.0%)
2025-07-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-31
Operativo (100.0%)
Operativo (100.0%)
2025-08-01
Operativo (99.7%)
Operativo (99.7%)
2025-08-02
Operativo (100.0%)
Operativo (100.0%)
2025-08-03
Operativo (100.0%)
Operativo (100.0%)
2025-08-04
Operativo (99.7%)
Operativo (99.7%)
2025-08-05
Operativo (100.0%)
Operativo (100.0%)
2025-08-06
Operativo (99.8%)
Operativo (99.8%)
2025-08-07
Operativo (99.6%)
Operativo (99.6%)
2025-08-08
Operativo (100.0%)
Operativo (100.0%)
2025-08-09
Operativo (100.0%)
Operativo (100.0%)
White Label Files
2025-05-12
Operativo (100.0%)
Operativo (100.0%)
2025-05-13
Operativo (100.0%)
Operativo (100.0%)
2025-05-14
Operativo (100.0%)
Operativo (100.0%)
2025-05-15
Operativo (100.0%)
Operativo (100.0%)
2025-05-16
Operativo (100.0%)
Operativo (100.0%)
2025-05-17
Operativo (100.0%)
Operativo (100.0%)
2025-05-18
Operativo (100.0%)
Operativo (100.0%)
2025-05-19
Operativo (100.0%)
Operativo (100.0%)
2025-05-20
Operativo (100.0%)
Operativo (100.0%)
2025-05-21
Operativo (100.0%)
Operativo (100.0%)
2025-05-22
Operativo (100.0%)
Operativo (100.0%)
2025-05-23
Operativo (100.0%)
Operativo (100.0%)
2025-05-24
Operativo (100.0%)
Operativo (100.0%)
2025-05-25
Operativo (100.0%)
Operativo (100.0%)
2025-05-26
Operativo (100.0%)
Operativo (100.0%)
2025-05-27
Operativo (100.0%)
Operativo (100.0%)
2025-05-28
Operativo (100.0%)
Operativo (100.0%)
2025-05-29
Operativo (100.0%)
Operativo (100.0%)
2025-05-30
Operativo (100.0%)
Operativo (100.0%)
2025-05-31
Operativo (100.0%)
Operativo (100.0%)
2025-06-01
Operativo (100.0%)
Operativo (100.0%)
2025-06-02
Operativo (100.0%)
Operativo (100.0%)
2025-06-03
Operativo (100.0%)
Operativo (100.0%)
2025-06-04
Operativo (100.0%)
Operativo (100.0%)
2025-06-05
Operativo (100.0%)
Operativo (100.0%)
2025-06-06
Operativo (100.0%)
Operativo (100.0%)
2025-06-07
Operativo (100.0%)
Operativo (100.0%)
2025-06-08
Operativo (100.0%)
Operativo (100.0%)
2025-06-09
Operativo (100.0%)
Operativo (100.0%)
2025-06-10
Operativo (100.0%)
Operativo (100.0%)
2025-06-11
Operativo (100.0%)
Operativo (100.0%)
2025-06-12
Operativo (100.0%)
Operativo (100.0%)
2025-06-13
Operativo (100.0%)
Operativo (100.0%)
2025-06-14
Operativo (100.0%)
Operativo (100.0%)
2025-06-15
Operativo (100.0%)
Operativo (100.0%)
2025-06-16
Operativo (100.0%)
Operativo (100.0%)
2025-06-17
Operativo (100.0%)
Operativo (100.0%)
2025-06-18
Operativo (100.0%)
Operativo (100.0%)
2025-06-19
Operativo (100.0%)
Operativo (100.0%)
2025-06-20
Operativo (100.0%)
Operativo (100.0%)
2025-06-21
Operativo (100.0%)
Operativo (100.0%)
2025-06-22
Operativo (100.0%)
Operativo (100.0%)
2025-06-23
Operativo (100.0%)
Operativo (100.0%)
2025-06-24
Operativo (100.0%)
Operativo (100.0%)
2025-06-25
Operativo (100.0%)
Operativo (100.0%)
2025-06-26
Operativo (100.0%)
Operativo (100.0%)
2025-06-27
Operativo (100.0%)
Operativo (100.0%)
2025-06-28
Operativo (100.0%)
Operativo (100.0%)
2025-06-29
Operativo (100.0%)
Operativo (100.0%)
2025-06-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-01
Prestazioni Degradate (97.4%)
Prestazioni Degradate (97.4%)
2025-07-02
Operativo (99.5%)
Operativo (99.5%)
2025-07-03
Operativo (100.0%)
Operativo (100.0%)
2025-07-04
Operativo (99.7%)
Operativo (99.7%)
2025-07-05
Operativo (100.0%)
Operativo (100.0%)
2025-07-06
Operativo (100.0%)
Operativo (100.0%)
2025-07-07
Operativo (99.8%)
Operativo (99.8%)
2025-07-08
Operativo (100.0%)
Operativo (100.0%)
2025-07-09
Operativo (99.8%)
Operativo (99.8%)
2025-07-10
Operativo (99.3%)
Operativo (99.3%)
2025-07-11
Operativo (100.0%)
Operativo (100.0%)
2025-07-12
Operativo (100.0%)
Operativo (100.0%)
2025-07-13
Operativo (100.0%)
Operativo (100.0%)
2025-07-14
Operativo (99.8%)
Operativo (99.8%)
2025-07-15
Operativo (100.0%)
Operativo (100.0%)
2025-07-16
Operativo (100.0%)
Operativo (100.0%)
2025-07-17
Operativo (100.0%)
Operativo (100.0%)
2025-07-18
Operativo (100.0%)
Operativo (100.0%)
2025-07-19
Operativo (100.0%)
Operativo (100.0%)
2025-07-20
Operativo (99.7%)
Operativo (99.7%)
2025-07-21
Operativo (99.7%)
Operativo (99.7%)
2025-07-22
Operativo (99.7%)
Operativo (99.7%)
2025-07-23
Operativo (99.7%)
Operativo (99.7%)
2025-07-24
Operativo (100.0%)
Operativo (100.0%)
2025-07-25
Operativo (100.0%)
Operativo (100.0%)
2025-07-26
Operativo (99.7%)
Operativo (99.7%)
2025-07-27
Operativo (100.0%)
Operativo (100.0%)
2025-07-28
Operativo (100.0%)
Operativo (100.0%)
2025-07-29
Operativo (99.5%)
Operativo (99.5%)
2025-07-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-31
Operativo (100.0%)
Operativo (100.0%)
2025-08-01
Operativo (100.0%)
Operativo (100.0%)
2025-08-02
Operativo (100.0%)
Operativo (100.0%)
2025-08-03
Operativo (100.0%)
Operativo (100.0%)
2025-08-04
Operativo (99.4%)
Operativo (99.4%)
2025-08-05
Operativo (99.4%)
Operativo (99.4%)
2025-08-06
Operativo (99.8%)
Operativo (99.8%)
2025-08-07
Operativo (99.8%)
Operativo (99.8%)
2025-08-08
Operativo (100.0%)
Operativo (100.0%)
2025-08-09
Operativo (99.6%)
Operativo (99.6%)
White Label Forms
2025-05-12
Operativo (100.0%)
Operativo (100.0%)
2025-05-13
Operativo (100.0%)
Operativo (100.0%)
2025-05-14
Operativo (100.0%)
Operativo (100.0%)
2025-05-15
Operativo (100.0%)
Operativo (100.0%)
2025-05-16
Operativo (100.0%)
Operativo (100.0%)
2025-05-17
Operativo (100.0%)
Operativo (100.0%)
2025-05-18
Operativo (100.0%)
Operativo (100.0%)
2025-05-19
Operativo (100.0%)
Operativo (100.0%)
2025-05-20
Operativo (100.0%)
Operativo (100.0%)
2025-05-21
Operativo (100.0%)
Operativo (100.0%)
2025-05-22
Operativo (100.0%)
Operativo (100.0%)
2025-05-23
Operativo (100.0%)
Operativo (100.0%)
2025-05-24
Operativo (100.0%)
Operativo (100.0%)
2025-05-25
Operativo (100.0%)
Operativo (100.0%)
2025-05-26
Operativo (100.0%)
Operativo (100.0%)
2025-05-27
Operativo (100.0%)
Operativo (100.0%)
2025-05-28
Operativo (100.0%)
Operativo (100.0%)
2025-05-29
Operativo (100.0%)
Operativo (100.0%)
2025-05-30
Operativo (100.0%)
Operativo (100.0%)
2025-05-31
Operativo (100.0%)
Operativo (100.0%)
2025-06-01
Operativo (100.0%)
Operativo (100.0%)
2025-06-02
Operativo (100.0%)
Operativo (100.0%)
2025-06-03
Operativo (100.0%)
Operativo (100.0%)
2025-06-04
Operativo (100.0%)
Operativo (100.0%)
2025-06-05
Operativo (100.0%)
Operativo (100.0%)
2025-06-06
Operativo (100.0%)
Operativo (100.0%)
2025-06-07
Operativo (100.0%)
Operativo (100.0%)
2025-06-08
Operativo (100.0%)
Operativo (100.0%)
2025-06-09
Operativo (100.0%)
Operativo (100.0%)
2025-06-10
Operativo (100.0%)
Operativo (100.0%)
2025-06-11
Operativo (100.0%)
Operativo (100.0%)
2025-06-12
Operativo (100.0%)
Operativo (100.0%)
2025-06-13
Operativo (100.0%)
Operativo (100.0%)
2025-06-14
Operativo (100.0%)
Operativo (100.0%)
2025-06-15
Operativo (100.0%)
Operativo (100.0%)
2025-06-16
Operativo (100.0%)
Operativo (100.0%)
2025-06-17
Operativo (100.0%)
Operativo (100.0%)
2025-06-18
Operativo (100.0%)
Operativo (100.0%)
2025-06-19
Operativo (100.0%)
Operativo (100.0%)
2025-06-20
Operativo (100.0%)
Operativo (100.0%)
2025-06-21
Operativo (100.0%)
Operativo (100.0%)
2025-06-22
Operativo (100.0%)
Operativo (100.0%)
2025-06-23
Operativo (100.0%)
Operativo (100.0%)
2025-06-24
Operativo (100.0%)
Operativo (100.0%)
2025-06-25
Operativo (100.0%)
Operativo (100.0%)
2025-06-26
Operativo (100.0%)
Operativo (100.0%)
2025-06-27
Operativo (100.0%)
Operativo (100.0%)
2025-06-28
Operativo (100.0%)
Operativo (100.0%)
2025-06-29
Operativo (100.0%)
Operativo (100.0%)
2025-06-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-01
Operativo (99.4%)
Operativo (99.4%)
2025-07-02
Operativo (100.0%)
Operativo (100.0%)
2025-07-03
Operativo (100.0%)
Operativo (100.0%)
2025-07-04
Operativo (100.0%)
Operativo (100.0%)
2025-07-05
Operativo (100.0%)
Operativo (100.0%)
2025-07-06
Operativo (100.0%)
Operativo (100.0%)
2025-07-07
Operativo (100.0%)
Operativo (100.0%)
2025-07-08
Operativo (99.7%)
Operativo (99.7%)
2025-07-09
Operativo (100.0%)
Operativo (100.0%)
2025-07-10
Operativo (99.5%)
Operativo (99.5%)
2025-07-11
Operativo (100.0%)
Operativo (100.0%)
2025-07-12
Operativo (99.8%)
Operativo (99.8%)
2025-07-13
Operativo (100.0%)
Operativo (100.0%)
2025-07-14
Operativo (100.0%)
Operativo (100.0%)
2025-07-15
Operativo (100.0%)
Operativo (100.0%)
2025-07-16
Operativo (100.0%)
Operativo (100.0%)
2025-07-17
Operativo (99.7%)
Operativo (99.7%)
2025-07-18
Operativo (99.8%)
Operativo (99.8%)
2025-07-19
Operativo (99.7%)
Operativo (99.7%)
2025-07-20
Operativo (99.7%)
Operativo (99.7%)
2025-07-21
Operativo (100.0%)
Operativo (100.0%)
2025-07-22
Operativo (100.0%)
Operativo (100.0%)
2025-07-23
Operativo (99.7%)
Operativo (99.7%)
2025-07-24
Operativo (99.7%)
Operativo (99.7%)
2025-07-25
Operativo (100.0%)
Operativo (100.0%)
2025-07-26
Operativo (99.4%)
Operativo (99.4%)
2025-07-27
Operativo (100.0%)
Operativo (100.0%)
2025-07-28
Operativo (100.0%)
Operativo (100.0%)
2025-07-29
Operativo (99.8%)
Operativo (99.8%)
2025-07-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-31
Operativo (100.0%)
Operativo (100.0%)
2025-08-01
Operativo (100.0%)
Operativo (100.0%)
2025-08-02
Operativo (100.0%)
Operativo (100.0%)
2025-08-03
Operativo (100.0%)
Operativo (100.0%)
2025-08-04
Operativo (100.0%)
Operativo (100.0%)
2025-08-05
Operativo (100.0%)
Operativo (100.0%)
2025-08-06
Operativo (99.8%)
Operativo (99.8%)
2025-08-07
Operativo (99.8%)
Operativo (99.8%)
2025-08-08
Operativo (100.0%)
Operativo (100.0%)
2025-08-09
Operativo (100.0%)
Operativo (100.0%)
Realtime Engine
2025-05-12
Operativo (100.0%)
Operativo (100.0%)
2025-05-13
Operativo (100.0%)
Operativo (100.0%)
2025-05-14
Operativo (100.0%)
Operativo (100.0%)
2025-05-15
Operativo (100.0%)
Operativo (100.0%)
2025-05-16
Operativo (100.0%)
Operativo (100.0%)
2025-05-17
Operativo (100.0%)
Operativo (100.0%)
2025-05-18
Operativo (100.0%)
Operativo (100.0%)
2025-05-19
Operativo (100.0%)
Operativo (100.0%)
2025-05-20
Operativo (100.0%)
Operativo (100.0%)
2025-05-21
Operativo (100.0%)
Operativo (100.0%)
2025-05-22
Operativo (100.0%)
Operativo (100.0%)
2025-05-23
Operativo (100.0%)
Operativo (100.0%)
2025-05-24
Operativo (100.0%)
Operativo (100.0%)
2025-05-25
Operativo (100.0%)
Operativo (100.0%)
2025-05-26
Operativo (100.0%)
Operativo (100.0%)
2025-05-27
Operativo (100.0%)
Operativo (100.0%)
2025-05-28
Operativo (100.0%)
Operativo (100.0%)
2025-05-29
Operativo (100.0%)
Operativo (100.0%)
2025-05-30
Operativo (100.0%)
Operativo (100.0%)
2025-05-31
Operativo (100.0%)
Operativo (100.0%)
2025-06-01
Operativo (100.0%)
Operativo (100.0%)
2025-06-02
Operativo (100.0%)
Operativo (100.0%)
2025-06-03
Operativo (100.0%)
Operativo (100.0%)
2025-06-04
Operativo (100.0%)
Operativo (100.0%)
2025-06-05
Operativo (100.0%)
Operativo (100.0%)
2025-06-06
Operativo (100.0%)
Operativo (100.0%)
2025-06-07
Operativo (100.0%)
Operativo (100.0%)
2025-06-08
Operativo (100.0%)
Operativo (100.0%)
2025-06-09
Operativo (100.0%)
Operativo (100.0%)
2025-06-10
Operativo (100.0%)
Operativo (100.0%)
2025-06-11
Operativo (100.0%)
Operativo (100.0%)
2025-06-12
Operativo (100.0%)
Operativo (100.0%)
2025-06-13
Operativo (100.0%)
Operativo (100.0%)
2025-06-14
Operativo (100.0%)
Operativo (100.0%)
2025-06-15
Operativo (100.0%)
Operativo (100.0%)
2025-06-16
Operativo (100.0%)
Operativo (100.0%)
2025-06-17
Operativo (100.0%)
Operativo (100.0%)
2025-06-18
Operativo (100.0%)
Operativo (100.0%)
2025-06-19
Operativo (100.0%)
Operativo (100.0%)
2025-06-20
Operativo (100.0%)
Operativo (100.0%)
2025-06-21
Operativo (100.0%)
Operativo (100.0%)
2025-06-22
Operativo (100.0%)
Operativo (100.0%)
2025-06-23
Operativo (100.0%)
Operativo (100.0%)
2025-06-24
Operativo (100.0%)
Operativo (100.0%)
2025-06-25
Operativo (100.0%)
Operativo (100.0%)
2025-06-26
Operativo (100.0%)
Operativo (100.0%)
2025-06-27
Operativo (100.0%)
Operativo (100.0%)
2025-06-28
Operativo (100.0%)
Operativo (100.0%)
2025-06-29
Operativo (100.0%)
Operativo (100.0%)
2025-06-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-01
Operativo (99.4%)
Operativo (99.4%)
2025-07-02
Operativo (100.0%)
Operativo (100.0%)
2025-07-03
Operativo (100.0%)
Operativo (100.0%)
2025-07-04
Operativo (99.7%)
Operativo (99.7%)
2025-07-05
Operativo (100.0%)
Operativo (100.0%)
2025-07-06
Operativo (100.0%)
Operativo (100.0%)
2025-07-07
Operativo (100.0%)
Operativo (100.0%)
2025-07-08
Operativo (99.7%)
Operativo (99.7%)
2025-07-09
Operativo (99.8%)
Operativo (99.8%)
2025-07-10
Operativo (99.5%)
Operativo (99.5%)
2025-07-11
Operativo (100.0%)
Operativo (100.0%)
2025-07-12
Operativo (100.0%)
Operativo (100.0%)
2025-07-13
Operativo (100.0%)
Operativo (100.0%)
2025-07-14
Operativo (100.0%)
Operativo (100.0%)
2025-07-15
Operativo (100.0%)
Operativo (100.0%)
2025-07-16
Operativo (100.0%)
Operativo (100.0%)
2025-07-17
Operativo (100.0%)
Operativo (100.0%)
2025-07-18
Operativo (99.8%)
Operativo (99.8%)
2025-07-19
Operativo (100.0%)
Operativo (100.0%)
2025-07-20
Operativo (100.0%)
Operativo (100.0%)
2025-07-21
Operativo (99.7%)
Operativo (99.7%)
2025-07-22
Operativo (100.0%)
Operativo (100.0%)
2025-07-23
Operativo (100.0%)
Operativo (100.0%)
2025-07-24
Operativo (99.7%)
Operativo (99.7%)
2025-07-25
Operativo (100.0%)
Operativo (100.0%)
2025-07-26
Operativo (100.0%)
Operativo (100.0%)
2025-07-27
Operativo (100.0%)
Operativo (100.0%)
2025-07-28
Operativo (100.0%)
Operativo (100.0%)
2025-07-29
Operativo (100.0%)
Operativo (100.0%)
2025-07-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-31
Operativo (100.0%)
Operativo (100.0%)
2025-08-01
Operativo (99.7%)
Operativo (99.7%)
2025-08-02
Operativo (100.0%)
Operativo (100.0%)
2025-08-03
Operativo (100.0%)
Operativo (100.0%)
2025-08-04
Operativo (99.7%)
Operativo (99.7%)
2025-08-05
Operativo (100.0%)
Operativo (100.0%)
2025-08-06
Operativo (99.8%)
Operativo (99.8%)
2025-08-07
Operativo (99.8%)
Operativo (99.8%)
2025-08-08
Operativo (100.0%)
Operativo (100.0%)
2025-08-09
Operativo (100.0%)
Operativo (100.0%)
Search
2025-05-12
Operativo (100.0%)
Operativo (100.0%)
2025-05-13
Operativo (100.0%)
Operativo (100.0%)
2025-05-14
Operativo (100.0%)
Operativo (100.0%)
2025-05-15
Operativo (100.0%)
Operativo (100.0%)
2025-05-16
Operativo (100.0%)
Operativo (100.0%)
2025-05-17
Operativo (100.0%)
Operativo (100.0%)
2025-05-18
Operativo (100.0%)
Operativo (100.0%)
2025-05-19
Operativo (100.0%)
Operativo (100.0%)
2025-05-20
Operativo (100.0%)
Operativo (100.0%)
2025-05-21
Operativo (100.0%)
Operativo (100.0%)
2025-05-22
Operativo (100.0%)
Operativo (100.0%)
2025-05-23
Operativo (100.0%)
Operativo (100.0%)
2025-05-24
Operativo (100.0%)
Operativo (100.0%)
2025-05-25
Operativo (100.0%)
Operativo (100.0%)
2025-05-26
Operativo (100.0%)
Operativo (100.0%)
2025-05-27
Operativo (100.0%)
Operativo (100.0%)
2025-05-28
Operativo (100.0%)
Operativo (100.0%)
2025-05-29
Operativo (100.0%)
Operativo (100.0%)
2025-05-30
Operativo (100.0%)
Operativo (100.0%)
2025-05-31
Operativo (100.0%)
Operativo (100.0%)
2025-06-01
Operativo (100.0%)
Operativo (100.0%)
2025-06-02
Operativo (100.0%)
Operativo (100.0%)
2025-06-03
Operativo (100.0%)
Operativo (100.0%)
2025-06-04
Operativo (100.0%)
Operativo (100.0%)
2025-06-05
Operativo (100.0%)
Operativo (100.0%)
2025-06-06
Operativo (100.0%)
Operativo (100.0%)
2025-06-07
Operativo (100.0%)
Operativo (100.0%)
2025-06-08
Operativo (100.0%)
Operativo (100.0%)
2025-06-09
Operativo (100.0%)
Operativo (100.0%)
2025-06-10
Operativo (100.0%)
Operativo (100.0%)
2025-06-11
Operativo (100.0%)
Operativo (100.0%)
2025-06-12
Operativo (100.0%)
Operativo (100.0%)
2025-06-13
Operativo (100.0%)
Operativo (100.0%)
2025-06-14
Operativo (100.0%)
Operativo (100.0%)
2025-06-15
Operativo (100.0%)
Operativo (100.0%)
2025-06-16
Operativo (100.0%)
Operativo (100.0%)
2025-06-17
Operativo (100.0%)
Operativo (100.0%)
2025-06-18
Operativo (100.0%)
Operativo (100.0%)
2025-06-19
Operativo (100.0%)
Operativo (100.0%)
2025-06-20
Operativo (100.0%)
Operativo (100.0%)
2025-06-21
Operativo (100.0%)
Operativo (100.0%)
2025-06-22
Operativo (100.0%)
Operativo (100.0%)
2025-06-23
Operativo (100.0%)
Operativo (100.0%)
2025-06-24
Operativo (100.0%)
Operativo (100.0%)
2025-06-25
Operativo (100.0%)
Operativo (100.0%)
2025-06-26
Operativo (100.0%)
Operativo (100.0%)
2025-06-27
Operativo (100.0%)
Operativo (100.0%)
2025-06-28
Operativo (100.0%)
Operativo (100.0%)
2025-06-29
Operativo (100.0%)
Operativo (100.0%)
2025-06-30
Operativo (100.0%)
Operativo (100.0%)
2025-07-01
Operativo (99.4%)
Operativo (99.4%)
2025-07-02
Operativo (100.0%)
Operativo (100.0%)
2025-07-03
Operativo (100.0%)
Operativo (100.0%)
2025-07-04
Operativo (99.7%)
Operativo (99.7%)
2025-07-05
Operativo (100.0%)
Operativo (100.0%)
2025-07-06
Operativo (100.0%)
Operativo (100.0%)
2025-07-07
Operativo (100.0%)
Operativo (100.0%)
2025-07-08
Operativo (100.0%)
Operativo (100.0%)
2025-07-09
Operativo (100.0%)
Operativo (100.0%)
2025-07-10
Operativo (99.5%)
Operativo (99.5%)
2025-07-11
Operativo (100.0%)
Operativo (100.0%)
2025-07-12
Operativo (100.0%)
Operativo (100.0%)
2025-07-13
Operativo (100.0%)
Operativo (100.0%)
2025-07-14
Operativo (100.0%)
Operativo (100.0%)
2025-07-15
Operativo (100.0%)
Operativo (100.0%)
2025-07-16
Operativo (100.0%)
Operativo (100.0%)
2025-07-17
Operativo (100.0%)
Operativo (100.0%)
2025-07-18
Operativo (99.8%)
Operativo (99.8%)
2025-07-19
Operativo (100.0%)
Operativo (100.0%)
2025-07-20
Operativo (99.7%)
Operativo (99.7%)
2025-07-21
Operativo (99.7%)
Operativo (99.7%)
2025-07-22
Operativo (100.0%)
Operativo (100.0%)
2025-07-23
Operativo (100.0%)
Operativo (100.0%)
2025-07-24
Operativo (100.0%)
Operativo (100.0%)
2025-07-25
Operativo (100.0%)
Operativo (100.0%)
2025-07-26
Operativo (100.0%)
Operativo (100.0%)
2025-07-27
Operativo (100.0%)
Operativo (100.0%)
2025-07-28
Operativo (100.0%)
Operativo (100.0%)
2025-07-29
Operativo (99.8%)
Operativo (99.8%)
2025-07-30
Operativo (99.7%)
Operativo (99.7%)
2025-07-31
Operativo (100.0%)
Operativo (100.0%)
2025-08-01
Operativo (100.0%)
Operativo (100.0%)
2025-08-02
Operativo (100.0%)
Operativo (100.0%)
2025-08-03
Operativo (100.0%)
Operativo (100.0%)
2025-08-04
Operativo (99.7%)
Operativo (99.7%)
2025-08-05
Operativo (100.0%)
Operativo (100.0%)
2025-08-06
Operativo (99.5%)
Operativo (99.5%)
2025-08-07
Operativo (99.8%)
Operativo (99.8%)
2025-08-08
Operativo (99.7%)
Operativo (99.7%)
2025-08-09
Operativo (100.0%)
Operativo (100.0%)
Ultimo aggiornamento: Aug 9, 2025 21:12:38 UTC